Steel & LVL Beam Installation in Toronto

20 ft steel beam installed under open ceiling joists in a room with a brick fireplace
20 ft steel beam installed under open ceiling joists in a room with a brick fireplacePhoto shared by a client on HomeStars

The beam is what makes an open concept possible. We install steel and LVL beams – flush in the ceiling or dropped below it – with the posts, connections and footings your engineer specifies, and we see the job through to a passed inspection.

Finished main floor opened up by a 20 ft steel beam, with the fireplace room beyond
Finished main floor opened up by a 20 ft steel beam, with the fireplace room beyondPhoto shared by a client on HomeStars
Steel beam set flush into the ceiling joists beside a staircase
Steel beam set flush into the ceiling joists beside a staircasePhoto shared by a client on HomeStars
Finished, painted opening with a boxed post after a flush steel beam installation
Finished, painted opening with a boxed post after a flush steel beam installationPhoto shared by a client on HomeStars
Close-up of a bolted steel beam-to-column connection
Close-up of a bolted steel beam-to-column connection
Steel beam on a steel column across a long open room in Richmond Hill
Steel beam on a steel column across a long open room in Richmond Hill

Drawings and permit included; about 7 days to prepare, then typically 2–3 weeks for city approval (how permits work).

Steel or LVL?

LVL beam Steel beam
What it is Engineered wood made from glued layers of veneer Rolled steel section (e.g. a W-beam)
Typical use Shorter and moderate spans in wood-frame houses Longer spans, heavier loads, shallow flush beams
Handling Lighter; carried in by hand and bolted in plies Heavy; may need extra crew or equipment, sometimes welding
Who decides Your structural engineer Your structural engineer

We install both and often combine them. One client's job used "4 steel beams and one LVL" (Neil Evans, HomeStars, 26 Nov 2020). Full comparison: Steel Beam vs LVL Beam.

Flush vs dropped beams

Dropped beam: sits below the ceiling and stays visible. Less work and usually lower cost. Can be boxed in with drywall.

Flush beam: set into a pocket between the ceiling joists, which are then hung from the beam with metal hangers. The ceiling looks flat when finished – the cleanest look for an open concept, with more work involved.

Finished opening with a dropped beam visible below the ceiling between two rooms
Finished opening with a dropped beam visible below the ceiling between two rooms
Ceiling opened between the joists to set a flush beam, temporary posts in place
Ceiling opened between the joists to set a flush beam, temporary posts in place
Illustration flush beam vs dropped beam cross-section, side by side.

Posts and footings

A beam is only as good as what holds it up. Each end bears on a post, and the load travels down to the foundation. Where there's nothing solid below, we dig through the basement floor and pour a new concrete footing, inspected before the pour. See Basement Walls, Posts & Footings.

Our installation process

  1. Site visit and quote
  2. Engineer's drawings specifying beam, posts and footings
  3. City permit
  4. Temporary shoring
  5. Beam installation to the drawings
  6. City inspection and clean-up

What clients say

"I recently hired E.B Design to enlarge my garage door and install a steel beam in my living room, They are very professional,on time and prepared."

— Customer of E.B. Design & Construction Inc. (HomeStars, 17 Oct 2022)

"We hired this compnay to remove a load bearing wall and install a steel beam with 2 posts,they did great job hightly recommend them."

— HomeOwner (HomeStars, 8 Jan 2019)

"Called them up on a Monday and within a week, we had our beam installed."

— HomeOwner (HomeStars, 29 Nov 2019)

Cost

Steel usually costs more than LVL, and flush more than dropped. See our cost guide for everything that affects the price, and ask us for a free quote.

Insured for structural work, $2 million liability; certificate provided on request. Before you hire anyone, ask whether their liability policy covers structural work.

Frequently asked questions

Once the permit is in place, many beam installations take a few days on site. Larger jobs with several beams or new footings take longer; your schedule is set out in your quote.

Yes, and steel is often chosen for flush beams because it carries the load in a shallower depth. The engineer confirms the size.

Multiple LVL plies are fastened together with structural bolts or fasteners specified by the engineer.

Yes, when the beam replaces a load-bearing wall or changes the structure. We prepare the drawings and apply for the permit.

Yes. We've corrected beams that caused ceiling cracks or were cut by other contractors, working to a new engineer's design.

Peace of mind

What we stand behind

  • Insured for structural work, $2 million liability. Certificate provided on request. Ask any contractor whether their policy covers structural work specifically, because many renovation policies do not.
  • The job is ours until the inspection passes. From the day you sign to the day the city signs off, it is on us. If an inspector asks for something to be changed, putting it right is not an extra cost to you.
  • The price in the contract is the price. We do not add to it mid-job. That is why the site visit takes about two hours: what is inside the wall and whether a footing is needed get settled before you sign.

Free estimate

Get a free quote

Send a few photos of the wall and we'll get back to you with next steps.

or talk to us

See our privacy policy.