How Long Does It Take to Remove a Load-Bearing Wall?

Room under renovation with an open ceiling strip and exposed timber wall framing.
Educational renovation photo — not a MyBeam project. A room during renovation. Photo by Stilfehler via Wikimedia Commons, CC BY-SA 4.0. Resized and re-encoded; metadata removed.

By the MyBeam team (E.B. Design & Construction Inc.) · Updated November 2026

Permit package, timing and inspections

Our permit package is included in the contract. It covers the site measurements, preparing the drawing, submitting the application and getting city approval. The homeowner pays the municipality's application review fee separately; it varies by municipality.

Editorial planning illustration for a measuring visit, drawings and application, and City approval; timings are MyBeam estimates, not City guarantees.

The application goes in the client's name and address. MyBeam gets authorization from the client to apply for the permit on their behalf, so they don't have to handle the permit paperwork themselves — they pay, and we do the rest.

The site visit takes about 2 hours to measure the whole house. We then need 7 days to prepare the drawings and application, followed by a 2–3 week wait for city permit approval.

MyBeam books the city inspections, is responsible for the work passing inspection, and sends the inspection report to the client once it has passed.

Before the work starts

Stage What happens Typical time
Call and site visit We look at the wall and what's above and below About 2 hours to measure the whole house; we reply within 24 hours to arrange it
Quote Written scope and price After the visit (one client had theirs within 24 hours)
Engineer's drawings Beam, posts, footings designed 7 days for drawings and application
City permit Review and approval Typically 2–3 weeks (varies by city)

On site: a typical single-wall job

Day 1 – Protect and shore. Floors and furniture covered, work area sealed, temporary support walls built on both sides.

Day 2 – Remove and install. The wall comes out, services are made safe, the beam and posts go in to the drawings.

Day 3 – Inspection and tidy-up. The inspector checks the work; then the shoring comes down and the ceiling can be closed.

This is an outline, not a promise. Our clients have reported single-wall jobs finished in anywhere from one to four days (see below).

From a HomeStars review

These photos show the doorway before work, temporary support during removal and the opened room at the structural stage. This review does not give a day count.

Wall with a framed doorway between rooms before removal.
Photo shared by a client on HomeStars. Before wall removal.
Temporary supports and exposed ceiling framing during wall removal.
Photo shared by a client on HomeStars. During wall removal and temporary support.
Room opened after wall removal with ceiling framing still exposed.
Photo shared by a client on HomeStars. After wall removal, before finishing.

He was on time and on budget. His crew was very respectful and cleaned up each nigh.

Load bearing wall removal · 3 Jul 2024 · HomeStars

Read more

Ehsan was a pleasure to work with! He was always available to answer questions and helpful. He was on time and on budget. His crew was very respectful and cleaned up each nigh. The project passed inspection and if a contractor tells you not to do this process with a permit then question them on it. Would highly recommend EB design for wall removal.

Browse the company’s HomeStars reviews, or visit our client reviews page.

Real timelines from our clients (HomeStars)

  • "The work took 1 day." – single load-bearing wall, Sept 2020
  • "removed bearing wall in 2 days" – kitchen, Nov 2019
  • "completed the job in 4 days" – two walls, open-concept kitchen, Aug 2021
  • "all completed within a week" – drawings, permit, shoring, 20 ft metal beam, flush posts and inspection, Feb 2024
  • "installed in ~8 days" – failing main beam in a 100-year-old house, Sept 2022
  • "2 weeks to the day" – four steel beams and one LVL, Nov 2020

What can add time

  • New footings (dig, inspect, pour, cure)
  • Ducts, plumbing or wiring to reroute
  • Surprises inside the wall – old damage, previous bad repairs
  • A busy permit office
  • Finishing (drywall, paint, flooring) after the structure is done
Pipes and building materials on the floor of an interior renovation.
Educational renovation photo — not a MyBeam project. Materials and pipes awaiting renovation work. Photo by Ksenia Chernaya via Pexels.

Frequently asked questions

Often a few days on site for one wall once the permit is issued; one to two weeks for large multi-beam jobs.

The site visit takes about 2 hours to measure the whole house. We then need 7 days to prepare the drawings and application, followed by a 2–3 week wait for city permit approval. Check your city's current timelines.

Yes, most clients do. The area is sealed off and cleaned every day.